CMH Broken Hill

We are proud to have been awarded the CMH Broken Hill Project.
Ozone Air Conditioning are carrying out a full D&C package for this medical centre.
The project involves chiller for cooling of MRI, x 2 CRAC units for the MRI Room, Daikin VRF systems throughout and all additional ventilation requirements.
Due for completion May 2021

NAB Gympie

Ozone Air Conditioning are very happy to carry out our Fourth NAB Bank fitout for Built. Like previous projects, this project has a tight turn around and detailed mechanical package with a high end finish.

Pier One

Ozone Air Conditioning upgraded all 200 rooms with brand new air conditioning systems including coils, heaters, valves, actuators, grills and Schneider Automation controls, operating not only the temperature but the lights and blind

NAB Hornsby

One of our first NAB Fitouts awarded to us by Built.

We installed a new air-cooled ducted Temperzone Split type AC and had to modify the ductwork to suit the new layout and connections of unit condensate drainage to the new tundish of the existing PAC unit.

We also installed a new ceiling mounted Fantech exhaust air fan and inline Fantech exhaust air fan.

Crown Plaza Hawkesbury Valley

Ozone Air Conditioning was awarded this 3 stage project for the refurbishment of the AC units to the hotel.

Ozone has already completed 2 stages and currently working on stage 3 with the replacement of the split units to each room with Panasonic Units.

Doohat Avenue

Ozone Air Conditioning was awarded with Lexpol Group for these x12 high-end luxury apartments including penthouse in North Sydney.

We installed Daikin VRV systems throughout each apartment with custom slim line flangeless grilles to give the high-end apartment look throughout.

Sail in The Desert

Ozone Air Conditioning is headed to the red centre.

Working with Reward Projects in Northern Territory, Ozone is working in stages as per the schedule to complete the replacement of 228 FCU’s

Shellharbour Airport

Ozone Air Conditioning were extremely excited to be awarded a full D&C contract for the construction of a new building at Shellharbour Regional Airport.
Given a brief, we engaged our own engineer and provided a design to meet the clients specific requirements. Our works included air conditioning throughout with economy cycle, utilising outside air for free heating and cooling during ideal conditions, along with all fresh air, exhaust and kitchen exhaust.
This project is on track (as always) and due for completion December 2020.
Contact us to find out more!

NAB Batemans Bay

Ozone Air Conditioning travelled South to complete this successful Fit Out at NAB Batemans Bay for Built. During the global pandemic this was a challenge in itself but we successfully completed this fit out project during these trying times.

Using the existing Temperzone system Ozone Air Conditioning supplied and installed new insulated sheetmetal ductwork to the existing FCU’s. We successfully installed filters, volume control dampers, ring plate axial fans and outside air intake cowl mounted to the roof of the building.